Ace Door Systems Case Studies
Case Studies
New Project Completed: East Anglia
Case Study: Industrial Door Project Completed: East Anglia Industrial Door Case Study: Project Completion in East Anglia We are pleased to announce a smooth multi-phase install for a commercial greenhouse in East Anglia. For this site we installed, [...]
High-Speed Roll-Up Door and Roller Shutter Installation
Case Study High Speed Roll Up Door & Roller Shutter Installation High-Speed Roll-Up Door and Roller Shutter Installation Works completed in Nelson! Our team installed a High-Speed Roll-Up Door and Roller Shutter for a [...]
Recent Installation Of Steel Doors In Newark
Rapid action speed doors are a vital component of many top-performing commercial buildings. The clue is in the name - they have a travel speed of up to 1.2 metres a second. This comes with unique benefits that set high-speed doors apart from regular rollers, shutters and sectional doors. This guide will explain the top four benefits of rapid action speed doors.
Alternative Roller Shutter Solution For National Retailer In Cumbria
Case Study Innovative Roller Shutter Install for National Retailer Roller Shutter Upgrade Project Completed in CumbriaAce Door Systems was recently approached by a national retail client in Cumbria who required urgent support following a quotation from another supplier for [...]
10 Metre Roller Shutter Installed in Portsmouth
Large 10.2 Metre x 6 Metre roller shutter installed in Portsmouth. 2000nm Direct Drive motor with 18g curtain. Specialist punched section...
Post Office Folding Door Installation
Case Study Post Office Folding Door Installation Record Automatic Folding Door Installation at Post Office Branch Ace Door Systems recently completed the installation of a Record automatic folding door system at a busy Post Office branch, replacing an [...]
Replacement 8 Metre Gate in Colchester
Case Study Replacement 8 Metre Gate in Colchester Bespoke Eight-Metre Gate Fabrication for Colchester SiteThe fabrication team at our Nelson workshop has once again demonstrated exceptional engineering capability with the manufacture of a bespoke gate exceeding eight metres in length. [...]
Four Industrial Shutters and Wicket Door
Case Study Four Industrial Shutters & Wicket Door Industrial Roller Shutter Installation for Storage Facility near DissAce Door Systems was recently appointed to supply and install four industrial roller shutters for a storage building located near Diss. The project presented [...]
Delayed Egress Door in London
Case Study Delayed Egress Door in London Delayed Egress Door Installation – London Even during challenging operating conditions, Ace Door Systems continues to support essential sectors, ensuring safety, security and uninterrupted operation. Our dedicated engineering team recently completed [...]
Latest Case Studies
Trusted Partnerships & Leading Brands
We partner with trusted industry brands and continually invest in technology and innovation to stay ahead of the curve. Our commitment to quality and reliability ensures every solution meets the highest standards delivering confidence and satisfaction for our customers.
























